    Professional Installation Guide for NFS22 Series Mechanical Flow Switches?

    Time: 2025-07-25 05:07:06 Click:0

    Here is the professional English translation of the NFS22 Series Mechanical Flow Switch installation guide:


    Professional Installation Guide for NFS22 Series Mechanical Flow Switches?


    I. Pre-Installation Preparation?

    Pipe Section Selection?


    Select horizontal or vertically upward-flowing straight pipe sections (inverted installation PROHIBITED)

    Ensure upstream/downstream straight pipe sections ≥5× pipe diameter; avoid turbulence sources (elbows, valves, etc.)

    Clean pipeline interior to prevent paddle obstruction


    Flow Direction Calibration?


    Confirm medium flow direction strictly matches the arrow indicator on the switch housing


    II. Mechanical Installation Procedure?

    Threaded Connection? (DN20/DN25 interfaces)


    Wrap PTFE thread seal tape or apply sealant to external pipe threads

    Hand-tighten the switch into pipe internal threads, then secure with a wrench for additional 1/4 turn (AVOID over-tightening to prevent housing deformation)


    Paddle Positioning?


    Paddle axis must be parallel to pipeline centerline

    Adjust insertion depth to ensure paddle remains suspended without contacting pipe walls/throttling elements


    III. Electrical Wiring Specifications?

    Safety Operations?


    Disconnect power and verify de-energization before wiring

    Use ONLY designated equipment grounding terminal for grounding


    Terminal Functions?


    Terminal Function Wire Color Example

    COM Common Terminal Yellow/Grey

    NO Normally Open (flow ON) White/Orange

    NC Normally Closed (flow OFF) Black/Blue


    ? Wiring Example?:

    Flow Protection: NO terminal → Equipment start/stop control circuit, COM terminal → Power supply positive


    IV. Commissioning & Verification?

    Flow Setting?


    Rotate adjustment knob clockwise to increase trigger flow, counterclockwise to decrease (accuracy: ±2%)

    Recommended setting range for fire protection systems: 1~3.5L/s


    Functional Testing?


    No-flow Test?: When flow drops below 10% of setpoint, NC contacts should CLOSE

    Full-flow Test?: When flow reaches setpoint, NO contacts must OPEN immediately (pressure loss ≤0.01bar)


    V. Prohibited Actions? ??


    DO NOT install inverted or with paddle contacting pipe walls

    NEVER wire under power or adjust non-calibration screws

    AVOID installation near vibration sources (pumps/compressors)


    Note: For hydraulic systems, post-installation testing must evaluate lubricating oil film's impact on paddle sensitivity.


    (This translation preserves all technical specifications, safety protocols, and industry terminology from the original Chinese documentation.)


    <kbd id="o8e0c"></kbd>
    <samp id="o8e0c"></samp>
  • <strike id="o8e0c"><menu id="o8e0c"></menu></strike>
  • <th id="o8e0c"></th>
  • <cite id="o8e0c"></cite>